Pelican Lake Home III
This Pelican Lake home was remodeled to provide more space for the owners. Remodeling and addition to the Main Level included increasing the Dining Room, Pantry, Powder Room, Master Suite that includes a Bedroom, Closet and Bathroom. A new stairway was incorporated along with the addition of a new Mud Room. The Upper Level remodel included the addition of a new hallway, Bonus Room and Storage area.
General Contractor: Paul Evenson Construction | Interior Designer: Owner

